With Woowon's strength and technology to change the landscape

Construction in Progress

Wallgot~Pangyo double-track railway No. 9 roadbed construction and other construction (section 2)

Name
Wallgot~Pangyo double-track railway No. 9 roadbed construction and other construction (section 2)
Period
2024.05.14 ~ 2028.11.21
Main-Contractor
Kumho Engineering & Construction Co., Ltd
Client
National Railroad Corporation
Project Overview
tunnel construction