Tunnel construction for Cheongna Line 7, Section 1 during the construction of Seoul Metropolitan Railway Line 7 Cheongna International City Extension Section 1 (Section 1-2)
Name
Tunnel construction for Cheongna Line 7, Section 1 during the construction of Seoul Metropolitan Railway Line 7 Cheongna International City Extension Section 1 (Section 1-2)
Period
2024.05.14 ~ 2028.11.21
Main-Contractor
Kumho Construction Co., Ltd.
Client
Incheon Metropolitan City Railway Construction Headquarters